Skip to content

Conversation

@longshuicy
Copy link
Member

@longshuicy longshuicy commented May 20, 2024

Code wise it is working, but not sure scientifically if it makes sense.

This analysis takes the recovery_rate function in residential/commercial recovery analysis and calculates it without the delay factor.

  • Repair curves are matched to each building
  • Given MCS output can determine the sample size N
  • For a given building, at each sample (N sample in total), create N size random number and plugin the repair curve to calculate the repair time (N)
  • This will result in a N * N matrix of repair time for each building

@longshuicy longshuicy linked an issue May 20, 2024 that may be closed by this pull request
@longshuicy longshuicy self-assigned this May 20, 2024
@navarroc
Copy link
Member

@jonglee1 who can we consult with on the logic for this analysis and whether it makes sense scientifically?

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Create building repair analysis

3 participants