Merge back 'chore_release-pd-8.6.3' into 'chore_release-8.8.0' #36863
pd-test-build-deploy.yaml
on: pull_request
Determine Deployment Configuration
14s
protocol designer unit tests
15s
protocol designer e2e tests
15s
Notify Build Success
0s
Notify Build Failure
0s
Notify Build Cancelled
0s
Annotations
7 errors
|
Determine Deployment Configuration
Canceling since a higher priority waiting request for PD test, build, and deploy-20083-true-true exists
|
|
Determine Deployment Configuration
The operation was canceled.
|
|
protocol designer e2e tests
Canceling since a higher priority waiting request for PD test, build, and deploy-20083-true-true exists
|
|
protocol designer e2e tests
The operation was canceled.
|
|
protocol designer unit tests
Canceling since a higher priority waiting request for PD test, build, and deploy-20083-true-true exists
|
|
protocol designer unit tests
The operation was canceled.
|
|
PD test, build, and deploy
Canceling since a higher priority waiting request for PD test, build, and deploy-20083-true-true exists
|